Construction

Progress photography, time-lapse and drone survey for UAE construction

We are usually appointed by the main contractor, or directly by the developer, against a Progress Photography and Time-lapse Works package. Cameras go up early and stay until handover.

AirTech Portal time-lapse player on a UAE construction site
AirTech solar-powered time-lapse camera on a construction site

The time-lapse camera

Built to run for the length of the build

Sensor24 MP. Frames are 6000 × 4000, so you can crop in and still read a level or a hoarding.
CaptureEvery 15 to 30 minutes through daylight hours.
PowerSolar. No mains and no cabling.
Connectivity4G or 5G SIM. No site network needed.
Storage1 TB on board, about 200 days. If the signal drops, capture continues and the backlog uploads when it returns.
MountingA neighbouring building, a crane or a site structure. On open plots, a galvanised scaffold tower on a concrete pad, with a laddered safety cage.
Live option4K PTZ cameras with 100 m infrared, recording 24/7, on the same timeline as the time-lapse archive.

Drone survey

Scheduled surveys, permits handled

Topographic mapping, volumetric measurement, 360 site panoramas and aerial progress records, flown on a schedule. Some clients take drone only, some take cameras only. Many take both.

  • Licensed. A registered RPAS operator across all seven emirates, with DCAA and GCAA certified pilots.
  • Permits handled. We apply for them ourselves, including NOC and MOD coordination.
  • Insured. USD 5 million public liability on every job.
Interior walkthrough captured on a finished villa, used for sales

One capture, two jobs

The record of the build is also the launch film.

The camera documenting the build produces the film for the launch. The survey flight shoots the aerials for the brochure. The 360 panoramas that compare last month to this one become the virtual tour for sales.

Buying monitoring and marketing from two suppliers means paying twice for the same mobilisation, permits and site access. Our media division has its own director, and the work comes off captures you are already paying for.

How it runs

  1. 1

    Set-up

    We survey the site and agree camera positions against the masterplan, checking sightlines will still work once the structure is up. We install, coordinate scaffold, access and permits, and commission each camera on the Portal.

  2. 2

    Running

    Preventive maintenance and post-weather checks, alerts if a camera loses power or signal, and faulty units replaced at no charge. Cameras move as the site changes, and new ones are added without touching the rest.

  3. 3

    Billing

    Normally quarterly against a PO. Tower or scaffold hire is itemised separately where it applies.

Tendering a progress photography package?

We respond to RFQs regularly. Method statements, risk assessments, insurance certificates, our trade licence and audited financials are ready to go with a submission.

Emaar logo
Aldar logo
Nakheel logo
Dubai Holding logo
Modon logo
Meraas logo
Majid Al Futtaim logo
Jumeirah Group logo
RTA Dubai logo
Brand Dubai logo
Wynn Al Marjan Island logo
Emirates logo
ACC Arabian Construction Company logo
ALEC logo
ASGC logo
Trojan Construction Group logo
H&H logo
Innovo logo
Boeing logo
Rolls-Royce logo
Ferrari logo
Audi logo
Lexus logo
Hyundai logo
Chevrolet logo
GMC logo
Samsung logo
Google logo
Nike logo
IKEA logo
CNN logo

Contact us today.
We look forward to hearing from you!